Track Record of Excellence
Beaver Infra has a long list of accomplishments with some of the biggest and most high profile infrastructure projects successfully completed to highest exacting standards that our clients and partners have come to expect from us.
Our Crowning Achievement
Mumbai-Nagpur Expressway
Beaver Infra is intimately involved in the construction of the Mumbai-Nagpur Expressway, AKA Samruddhi Mahamarg, which is a 6-lane wide, 701 km long access-controlled expressway in Maharashtra, India. The project is divided into 16 packages. It is one of India’s longest greenfield road projects and has six tunnels, one of which is Maharashtra’s longest tunnel. It is built using the ‘New Australian Tunneling Method’ and has a lifespan of 100 years. The expressway is capable of providing enhanced connectivity to the Marathwada and Vidarbha regions. The Maharashtra government believes that the expressway will become a prosperity corridor for the overall socio-economic growth of the state.
Beaver Infra is constructing access-controlled Nagpur-Mumbai super communication expressway on EPC mode for Package-13 (from KM 577+739 to KM 623+379).
Tunnel Projects
In the past few years, we have delivered 25 + tunneling projects for Indian Railways, National Highways Authority of India, Border Roads Organization, Maharashtra State Road Development Corporation, Irrigation Department of Andhra Pradesh, Water Irrigation Department of Uttar Pradesh and Water Resource Department of Jharkhand. These projects are vital to the functioning of the public works and span the breadth and length of the country.
According to the NBM&CW Infra Construction & Equipment Magazine (2021), tunneling infrastructure holds immense promise for contractors, consultants, technology and equipment providers, material suppliers etc. over the long term. Increasing number of tie ups between domestic industry companies and international players are likely to lead to reduced risk in project construction and timely completion.
Keeping the above in mind, Beaver Infra is uniquely well positioned to capitalize on the burgeoning market trends in the tunneling industry and has developed peerless expertise in design and engineering consultancy, construction supervision, 3D monitoring, geotechnical investigation, Final Location Survey, preparation of Detailed Project Report (DPR).
Geotechnical & Hydrological Investigations
We have effectively conducted 16 + geotechnical and hydrological investigations as per the requirement of our clients, which include the North East Frontier Railway, Maharashtra Rail Infrastructure Development Corporation Ltd., Dhorajia Construction Company, WCPL-RRCIIPL Consortium and RVR Projects Pvt Ltd. In HPCL, Vizag Refinery Project.
Examples of our work and services include Geological Investigation, Design of Tunnel Cross Section and Initial Support Scheme for various type of rocks, sub soil investigation of major/minor bridges and tunnel, final location and pre-construction survey, slope stability analysis, aerial survey of deep cuttings in challenging terrains such as Aizawl, Agartala, Meghalaya, Arunachal Pradesh, Abhyapuri, Imphal, Silchar etc.
Defense Projects
We have significant defense projects under our belt such as:
Tender inquiry and consultancy agreement for consultancy services for project in Area T-72 under CCE.
Tender Inquiry and Item Rate contract for provision of Geological Mapping, Geophysical Studies and Geological Investigation works in Area ‘P’ in Pocket B.